Hybrid - KE - 3x5kW
A project for one of the major GSM providers in Kenya. As the electricity grid is very limited in the country and due to the remote locations of the GSM towers with receivers and transmitters, an off-grid system is required.
The Wind Factory installed a wind-solar-diesel hybrid system on different sites on top of a mountain in order to decrease the costs of diesel fuel by more than 80%. Besides the logistical costs to get the fuel on site has been reduced by installation of the hybrid system.

System off-grid
Capacity Wind 3 turbines of 5kW
Capacity Solar 3 systems of 2,5kWp
Capacity Battery 3 battery packs of 2000Ah / 48V
Inverter type 48V/5000W
Construction lattice tower (12-24m)
Diesel gen. set 18kVA
Year of construction 2009
Client GSM provider
Country / region Kenya